Guildford Borough Council
Groundbreaking approach to BIM supports Guildford Borough Council in its CO2 reduction strategy

Case Study information
Client
Guildford Borough Council
Type of consultancy
Local government policy and sustainability strategy on the built environment
Guildford Borough Council wanted to reduce energy consumption and carbon dioxide emissions for new build properties and developments in its area. To do so, councillors were looking to change the existing target of a 10% reduction, through the use of Low and Zero Carbon (LZC) technologies against building regulations[1] outputs, to a 20% reduction. This would make it one of the most ambitious CO²reduction policies among UK local authorities for the built environment. It asked EVORA EDGE to assess the technical and economic viability of such a change and its impact on local developers.
[1]Building Regulations 2010 (Part L Approved Documents 2013 with 2016 amendments)
The predicted energy efficiency and carbon dioxide (CO2) emissions of new developments is assessed through the use of energy models and the requirements of Approved Document Part L of Building Regulations. EVORA EDGE began by building models for both domestic and non-domestic properties to determine the minimum requirements and the cost of construction to comply with Building Regulations. These ‘baseline buildings’ were then used to measure potential future CO2 reductions of any particular low-carbon or zero carbon technology such as photovoltaics, air-source heat pumps and solar hot water, for example. The additional cost of these LZC technologies was then assessed against the base cost of construction.
These construction costs were uniquely incorporated into the building information model (BIM) which means they are available for future use and can be used as working documents for any future policy changes.
This approach and expertise is unique to EVORA EDGE and showcases our ability to translate policy, academic theories and strategic asset management approaches (SAM) into real-world impact through building information models (BIM). This ensures decisions to do with the built environment are both robust and fit-for-purpose.
By using building simulation models combined with costing software, in a process unique to EVORA EDGE (called BIM:SAM), we were able to simulate a range of both domestic and non-domestic properties alongside typical construction costs and the impact of various LZC technologies. This enabled the council to evidence the anticipated extra costs for developers would not be excessive in most cases if the target was increased to 20%. Guildford Borough Council was able to present a detailed business case and justification for increasing the target to 20% which kept local developers on-side with the proposals.
Like this case study? Why not share it?
More Case Studies
EVORA provide Edmond de Rothschild with the tools to understand SFDR
Lendlease Italy SGR achieves 5 stars GRESB rating thanks to EVORA Italy support
BNP Paribas achieves target of Excellent rating in BREEAM In-Use
EVORA conducts in-depth review of climate risks for Assura
Tishman Speyer furthers ESG principles and climate resilience across the investment cycle
PATRIZIA achieves Fitwel certification with the support of EVORA
Quick links
Head Office
3rd Floor, Birrane House
2 – 4 Southwark Street
London, SE1 1TQ